Project Dry Hire logo
REACH STACKER - KALMAR DRG700-75ZXS

Overview

DH 45T Reach Stacker Range — long-term dry hire for laden container operations on major projects and logistics facilities where stack density and cycle speed drive yard economics.

Rated capacity covers the full laden ISO container mix — 20ft general cargo through to 40ft and 45ft high-cube at gross weights approaching the ISO maximum — maintained at working radius under load. Telescopic boom geometry delivers three-high stacking in the primary lane with row-depth density that volume operations need, without committing to fixed crane infrastructure.

PDH supplies these into container terminal auxiliary and overflow yards, intermodal rail terminals, heavy logistics hubs, and major construction programmes managing significant site container freight — anywhere a project needs dedicated laden-container throughput capacity for a defined programme duration.

The hire model suits operations where procurement lead times, capital exposure, or programme flexibility rule out ownership. PDH structures the term around the project timeline, bundles scheduled servicing into the weekly rate and handles compliance documentation — so the client gets a compliant, maintained machine on site without the asset sitting on their books when the programme wraps. For projects running container logistics alongside civil works, it's purpose-built capacity that arrives ready to work and leaves when the job does.

Key Features

  • Purpose-built for laden ISO container handling — 20ft through to 45ft high-cube at gross weights approaching the ISO maximum
  • Telescopic boom and top-spreader configuration; rated capacity maintained at working radius under load
  • Stacks three-high in the primary lane with the row-depth density volume terminal operations require
  • No fixed infrastructure — operates from prepared hardstand and moves freely between yard zones
  • Suited to container terminal auxiliary yards, intermodal rail terminals, heavy logistics hubs, and major construction programmes managing site container fleets
  • Long-term dry hire structured around the project timeline — no asset on the client's books when the programme wraps
  • Scheduled servicing bundled into the weekly rate via PDH's 6% service fee — one cost, no maintenance surprises
  • Compliance documentation handled by PDH — machine arrives site-ready
  • Avoids the capital exposure and procurement lead times of ownership, and the fixed infrastructure commitment of RTG or straddle carrier systems
  • Purpose-built throughput capacity that deploys with the project and redeployed when the job is done

Available Models*

*Units supplied may vary by brand, model and configuration depending on availability and site requirements. Capacity ratings are indicative and subject to load centre, attachments and operating conditions.